The sitework and building preparation at the Rydal Waters site continues! Foundations for Cottage 20 were dug, the Clubhouse foundations were laid out and pinned, and the stormwater structures and drainage pipes are being installed by the switch-back road. The switch-back road will connect directly to our Rydal Park campus so that all amenities between Rydal Park and Rydal Waters can be accessed by our residents. Additionally, grading for sequence 4 commenced.

Excavation is underway for the clubhouse, interior rough-ins for Cottage 16 has begun and patios for Cottages 14, 15 and 19 will be final by next week.